SafeConnect

Model No: SAFEC
$ 495.00



Now you can monitor power without exposure to high voltages

Be Safe - With the new rules surrounding NFPA -70E and arc-flash safety procedures, we advise electrical engineers to become conversant with all safety issues. More on NFPA 70E can be found here: Electrical Safety

NFPA 70E has highlighted the need to wear special gloves, eye-protection, or flame-retardant clothing, shoes etc. - collectively referred to as PPE or Personal Protective Equipment.

The main benefit of the SafeConect is to avoid opening panels and equipment in order to connect voltage probes and current probes to energized conductors when performing electrical testing. The SafeConnect will reduce the need to suit up in a higher level of PPE and contributes to higher safety by not exposing the test engineer directly to high voltages.

The SafeConnect voltage connections and current transformers are installed one-time. A military-type rugged connector to the meter is usually brought to the front of the panel or equipment. Voltage and current signals are not switched to the meter until the PowerSight umbilical connector is attached to the front panel connector. Thus a safe connection is made without ever exposing the user to dangerous voltages.

For many testing applications that require frequent re-testing or measurements, such as at motor control centers or switchgear, the SafeConnect once installed eliminates the need to power down every time testing connections need to be made, or set up protective barriers or warnings of an exposed panel or equipment.

Save Time - Quick setup and teardown of monitoring sessions on live power. ¼ turn of one connector connects all power signals. No need to remove doors panels. No need to deal with hooking up current probes in tight or inaccessible spaces. Perfect for periodic maintenance measurements.

Get it Right - Just a 1/4 turn of the military-type connector, connects all signals to the meter correctly. No switched phases, reversed probes, or dead channels. Permanent connections means the data is right when you return 1 month later.

SafeConnect is available now. To order first request a quote here: Request Quote
Specify SafeC (for 3 phase) or SafeC-N (for 3 phase plus neutral). SafeConnects include doughnut-type toroidal CTs, voltage leads, and manual. (Note: The S-model refers to split-core type CT's for those applications where it is not possible to break voltage conductors to install toroidal CT's.)
If you have application questions contact us also using the quote link.

For medium voltage applications up to 5kV you will also need PT's that step 5kV down to 600V. Here's a source: 3 Phase PT
Click on Components tab below for CT and voltage options.

Configuration Details: (CT=Current Transformer)
Model No. ........(No. of CTs) --- CT amps -- CT (insulation) volts -- List Price

SAFEC-5-6 ........... (3) -------- 5 amps ------------ 600 V --------------- $495.00
SAFEC-100-6 .........(3) ------- 100 amps --------- 600 V --------------- $495.00
SAFEC-1000-6 ...... (3) ------- 1,000 amps ------- 600 V --------------- $545.00
SAFEC-100-50 ...... (3) ------- 100 amps --------- 5,000 V ------------- $545.00
SAFEC-1000-50-S .. (3) ------ 1,000 amps ------- 5,000 V ------------- $995.00
SAFEC-1000-50 ..... (3) ------ 1,000 amps -------- 5,000 V ------------ $595.00
SAFEC-N-100-6 ..... (4) ------- 100 amps ---------- 600 V -------------- $595.00
SAFEC-N-1000-6 .... (4) ------ 1,000 amps -------- 600 V -------------- $645.00

Other Images(Click to View Larger Images)
Front panel connector

Specials

PK314 Rental System (other systems also available)
Rent a PowerSight! Need to solve an immediate problem? Contact us and we'll recommend a system complete with probes and our popular Report Writer software. Call 408 982 9280 for low rates!
SafeConnect
Safety first! The SafeConnect accessory simplifies connecting to monitoring test points and keeps you safe from high voltages!
PowerSight Power Analysis Software (+ Report Writer)
Put persuasion on paper! Summarize, tabulate, and document your power study results automatically with our Report Writer. The Report Writer software comes with every PowerSight.
Jumbo Voltage Alligator Clips (set of 4)
Get a Good Grip with our New Jumbo Clip! To make safe and secure voltage connections you need an alligator clip that just won’t let go! Our new “Jumbo” alligator clip has an excellent grasp of the situation.
Power Monitoring is a Process
Successful Power Studies Follow a Process. Read this paper to find out how to get successful power studies, first time, every time. "Power Monitoring is a Process"

Talk to a Power Monitoring Expert. Whatever your power study application we can help. Call 408 982 9280
NFPA 70E Electrical Testing Safety Application Note
Complying with NFPA 70E? Read this application note on safety. It describes how CAT IV and Bluetooth make the new PowerSight meters safe to use.
Temperature Humidity Logger
Summit Technology introduces Temperature and Humidity measurement. The TH-USB Temperature and Humidity logger at just $ 85 is a hot deal! So don't sweat it, go here for more information: